Lead times (without shipping time) - August 2023
Product Quantity Current Lead
Time (weeks) October 2022
Controls
IP20 I/O system X20BM* / X20TB* / X20DI* / X20DO* / X20AI* / X20AO* 26 40
IP20 I/O system rest (included PLC X20CP*) 26 52
X20 safety X20S* 35 52
X20 coated 35 52
X20 sets X20:* / X20Z* / X20A:* 1-100 pcs 26 52
« 101-500 pcs 26 52
« >500 pcs 26 52
IP67 system X67* 26 40
X90 1 - 50 pcs. 26 40
X90 >50 pcs. 26 40
Controls + HMI
Power Panels C and T 4PPC* / 6PPT* 26 48
Power Panels C-/T-Panels 4PPC* / 6PPT* custom mylar 26 48
Power Panel 65 4PP065* 26 52
Compact Systems 26 52
Vision Systems (smart sensor and smart camera)
Vision Systems VS* / VA* / VS* / VC* 1 - 2 pcs 8 8
« 3 - 5 pcs 9 9
« 6 - 10 pcs 10 10
Site Manager (remote maintenance)
Site Manager accessories: antenna 0RMSM.A* 12 12
Site Manager 0RMSM11* 12 12
HMI
Panelware 4A* / 4B* / 4PW* 26 50
Mobile Panels 5MP* 26 50
APC910 5Y* 1-15 pcs 26 50
« 16 - 50 pcs 26 50
B&R tries to deliver the respective products according to below indicative lead times, but we
cannot bindingly commit to such dates which can be changed at any time.
BnR Standard Delivery Lead Times 2023_August.xlsx Page 1 of 5
Lead times (without shipping time) - August 2023
Product Quantity Current Lead
Time (weeks) October 2022
B&R tries to deliver the respective products according to below indicative lead times, but we
cannot bindingly commit to such dates which can be changed at any time.
« 51 - 100 pcs 26 50
APC2100 5V* / APC2200 5R* 1-15 pcs 26 50
« 16 - 50 pcs 26 50
« 51 - 100 pcs 26 50
APC3100 5S* 1-15 pcs 26 50
« 16 - 50 pcs 26 50
« 51 - 100 pcs 26 50
PPC900 5Z* / PPC2100 5W* / PPC2200 5Q* / PPC1200 5F* 1-15 pcs 26 50
« 16 - 50 pcs 26 50
« 51 - 100 pcs 26 50
PPC3100 5T* 1-15 pcs 26 50
« 16 - 50 pcs 26 50
« 51 - 100 pcs 26 50
Automation Panels 5AP* (included custom devices) 26 50
Motion
ACOPOStrak 0 - 10 m On request On request
« 11 - 50 m On request On request
« 51 - 100 m On request On request
« > 100 m On request On request
SUPERtrak 22 22
ACOPOS 8V1010* / 8V1090* 1-30 pcs 35 50
« 31-100 pcs 35 50
ACOPOS 8V1180* / 8V128M* 1-15 pcs 35 50
« 16-50 pcs 35 50
« >50 pcs On request On request
ACOPOS coated 8V1010* / 8V1090* 1-10 pcs. 35 50
« 11-30 pcs. 35 50
BnR Standard Delivery Lead Times 2023_August.xlsx Page 2 of 5
Lead times (without shipping time) - August 2023
Product Quantity Current Lead
Time (weeks) October 2022
B&R tries to deliver the respective products according to below indicative lead times, but we
cannot bindingly commit to such dates which can be changed at any time.
« 31-100 pcs. 35 50
ACOPOS coated 8V1180* / 8V128M* 1-5 pcs. 35 50
« 6-15 pcs. 35 50
« 16-50 pcs. 35 50
ACOPOS P3 8EI* / 8EC* 1-30 pcs 35 52
« 31-100 pcs 35 52
ACOPOSmulti wall mounting 8BVIxxxxHW* ≤ 22 A
8BVI0014HW, 8BVI0028HW*, 8BVI0055HW*, 8BVI0110HW*, 8BVI0220HW* 35 40
ACOPOSmulti wall mounting 8BVIxxxxHW* ≥ 33 A
8BVI0330HW*, 8BVI0440HW*, 8BVI0660HW*, 8BVI0880HW*, 8BVI1650HW* 35 40
ACOPOSmulti cold plates '8BVIxxxxHC' 35 40
ACOPOSremote 8CV* 35 52
ACOPOSmicro 80V* / 80PS* 35 50
ACOPOSinverter S44* / X64* / P74* / P84* On request On request
ACOPOSinverter P66* / P76* / P86* 1 - 10 pcs 43 52
« 11 - 30 pcs 43 52
« > 30 pcs 43 52
ACOPOSinverter P96* On request On request
Customer specific products
Quantity contract first shipment 26 52
Call off order from quantity contract 26 52
Single-order w/o quantity contract 26 52
All other products 26 52
Accessories (cables,....) As corresponding product group As corresponding product group
Discontinued products On request On request
Motors with integrated servo drive
ACOPOSmotor '8DI3' / '8DI4' / '8DI5' 35 52
ACOPOSmotor '8DI3' / '8DI4' / '8DI5' with gearbox 35 52
Motors
Standard motors 8LSA (assembled in Austria) 1 - 10 pcs 33 52
« 11 - 30 pcs 33 52
Standard motors 8LSA2 / 8LSAA / 8LSA3 / 8LSA4 / 8LS5 / 8LSA7 33 52
BnR Standard Delivery Lead Times 2023_August.xlsx Page 3 of 5
Lead times (without shipping time) - August 2023
Product Quantity Current Lead
Time (weeks) October 2022
B&R tries to deliver the respective products according to below indicative lead times, but we
cannot bindingly commit to such dates which can be changed at any time.
Non standard motors 8LSA2 / 8LSAA / 8LSA3 / 8LSA4 / 8LSA5 / 8LSA6 33 52
Non standard motors 8LSA7 33 52
Non standard motors 8LSA8 33 52
8LVA1 / 8LVA2 / 8LVA3 33 52
8LWA1 / 8LWA2 / 8LWA3 33 52
8LVB1 / 8LVB2 / 8LVB3 33 52
8LSO9 / 8LSP9 33 52
8LSN4 / 8LSN5 33 52
8LSC4 / 8LSC5 / 8LSC6 33 52
8LSC7 33 52
8LSC8 33 52
8LSE4 / 8LSE6 33 52
8LSE8 33 52
8JS 33 35
8JSB/Q 33 35
Torque 8LTA /Q 9+C 33 52
Torque 8LTJ / S 9+C 33 52
Torque 8LTB / K 9 On request On request
8KS8 35 52
8KS9 35 52
8WS 35 52
8LW 35 52
Stepper motors 80MP 35 52
Servo motors options
Safety encoder (option S0/S1) +1 +1
Reinforced bearing (option 04/11) +2 +2
Reinforced bearing + brake +3 +3
Reinforced brake On request On request
8LSC5 A/B/C ("Cigarillo" length) +1 +1
BnR Standard Delivery Lead Times 2023_August.xlsx Page 4 of 5
Lead times (without shipping time) - August 2023
Product Quantity Current Lead
Time (weeks) October 2022
B&R tries to deliver the respective products according to below indicative lead times, but we
cannot bindingly commit to such dates which can be changed at any time.
Gearboxes
8GP40 / 8GF40 / 8GA40 / GP45 5 5
8GA45 / 8GP50 / 8GA50 / 8GP55 5 5
8GP60 / 8GF60 / 8GA60 / 8GP65 / 8GA65 5 5
8GA55 / 8GP70 / 8GF70 / 8GA75 5 5
Reduced backlash ("R") option +1 +1
Motor with assembled gearbox lead time motor +1 lead time motor +1